Tradutor

quinta-feira, fevereiro 24, 2011

Parar o TGV seria um acto de coragem

Concelar o concurso de TGV RAV Poceirão-Caia neste momento seria um acto de coragem política e de lucidez económica.

1 comentário:

  1. High speed signalling PPP

    18 February 2011

    SPAIN: With the aim of opening the route to traffic next year, ADIF has called tenders for a contract to design, install and maintain signalling and telecommunications equipment on 167 km of high speed infrastructure between Albacete and Alacant.

    As with construction of the Olmedo - Ourense route, work will be undertaken as a public-private partnership, with the winning bidder contributing to the funding package and ADIF taking a 10% stake in the special purpose vehicle that will undertake the project.

    A budget of €4468m has been set for the contract, which includes the installation of GSM-R as well as work on adjacent conventional routes to replace signalling equipment incompatible with 25 kV AC electrification.

    Source: Railway Gazette
    http://www.railwaygazette.com/nc/news/single-view/view/high-speed-signalling-ppp.html

    ResponderEliminar