Fiscal icebergs grow with excess global liquidity

The Economist (26-Sept-09) called attention to the uncontrolled growth of Governments' contingent liabilities pretty much all over the world. When all these "promissory notes" are presented for payment, it will be hellish to pay them.

In the US, 60% of the residential mortgage market is dependent on Government guarantees, though underwriting home loans is rather straightfoward as a banking product.

Government guarantees appear to be seen as panacea for all manner of economic and social problems. Taxpayers' promisses to pay work even better than current taxpayer funding. Politicians get to throw money around, but face no immediate resistance from voters.
What with bailouts of failing banks and companies and additional benefits and program commitments (entitlements), taxpayers are called upon to solve all problems and cover everyone's else mistakes. Additional calls on the taxpayers' money are also growing in the recesses of loss-making state-owned companies and in the form of contractual (availability) payments under PPP public service concession contracts that can go on for 30-40 years.

Like the Titanic, the taxpayers are sailing through ever more difficult waters, as the Government assume more and more fiscal risks.

The rating agencies, who have no capital at stake in their rating scores, may focus more on the actual Government debt than the liabilites hidden below the horizon.
But the financial markets have "sonar", and investors can evaluate and price even the indebtness that can't be seen.

Fiscal iceberg
Publication: The Economist, Saturday, September 26 2009
Guarantees offered during the crisis pose lasting risks to America

THE visible costs of the financial crisis are well known: bank recapitalisations, stimulus spending and shrunken tax revenues.Another set of liabilities—the guarantees thrown up around financial systems a year ago to quell panic and keep credit flowing—has received far less attention. Guarantees are popular because they entail no immediate cost. But they leave the sovereign balance-sheet exposed to lurches in the financial system’s fortunes.
In July the International Monetary Fund estimated that the median advanced economy had announced guarantee programmes worth 16.4% of GDP. The figure was 200% in Ireland, which guaranteed all its banks' liabilities, 50% in Britain and 34% in the Netherlands. The median bank recapitalisation was only 2.4% of GDP.
At first glance America is making progress withdrawing such guarantees. A backstop for money-market mutual funds expired on September 18th. A Federal Deposit Insurance Corporation ( FDIC ) guarantee for new bank debt is due to end in October. This week Bank of America said it would pay $425m to end a loss-sharing agreement with the federal government.
Yet America still has sizeable and, in places, growing contingent liabilities. The FDIC now guarantees $302 billion of bank debt, although it is unlikely to have to honour much, if any, of that since the lion's share was issued by big banks that the government is loth to let default. The bigger risk lies with a string of smaller bank failures, mostly caused by tumbling property values. After the FDIC repays depositors it tries to recoup the cost by selling the seized bank's assets. It now holds about $30 billion of assets from failed banks, and has agreed to share losses on a further $84 billion held by acquirers of the failed banks.
Reserves against future losses have eaten into the FDIC's deposit-insurance fund, leaving it at just $10 billion—less than one-fifth of its statutory minimum. Institutional Risk Analytics, a research firm, gloomily reckons that the FDIC's fund will take a total hit of $400 billion-500 billion before the crisis is over. The FDIC is now exploring options for replenishing the fund, including charging banks a special fee or asking them to prepay future fees. It could also borrow from the Treasury, or, less likely, from banks. Banks would ultimately have to cover all such costs through fees, but that would in turn reduce their ability to rebuild capital, potentially prolonging the need for government support.
But by far the most worrying contingent liability looming over America is its growing exposure to residential mortgages. Since 2008 the federal government has in effect backed the debt and guarantees of Fannie Mae and Freddie Mac, two huge housing-finance agencies. The Federal Housing Administration (FHA), another agency that will lend up to 97% of a property's value, has meanwhile been filling the vacuum left by subprime lenders. Total loans guaranteed by the three have grown by $277 billion this year, to $6.1 trillion.
By the end of the year the federal government will stand behind 59% of the mortgage market, says Edward Pinto, an industry consultant, more than double its exposure after similar interventions during the Depression (see chart). True, its share of the market was not much lower in 2003. But since then property values have tumbled and the average loan now stands at 90% of the home's value, up from 66% then. Mr Pinto predicts that the federal government will sustain $300 billion in credit losses on mortgage loans between now and 2012, and that the FHA will need a bailout. The agency dismisses such talk but concedes that its reserves are about to fall below its statutory minimum.
Apart from their direct costs, loan guarantees have other damaging effects. Michael Pomerleano, an economist who studied their use in the wake of the 1997-98 Asian crisis, says they lessen pressure on banks to dispose of bad assets. America's growing entanglement with the mortgage market also risks aggravating overinvestment in housing. The government should explain how it will withdraw its support before another crisis germinates.

Fonte: The Economist, various


VER  Encargos extra-orçamentais com Empresas Públicas e PPPs 

sexta-feira, outubro 16, 2009

Universidade de Coimbra entre as melhores

Muitos parabéns à Universidade de Coimbra (UC) que aparece mais uma vez como a instituição de ensino superior portuguesa mais bem cotada e a única entre as 400 melhores num ranking mundial publicado pelo The Times (Reino Unido).
A Universidade de Coimbra (UC) subiu 21 posições neste ranking para 366ª posição a nível mundial. A nível europeu, a UC ocupa o 166º lugar, em 3º lugar dentro da lusofonia em 6º lugar dentro da Península Ibérica.
Alguns dos critérios da seleção feita através de avaliação por pares, avaliação por empregadores, artigos científicos citados, rácio docentes /estudantes e são:
- a qualidade da investigação,
-a empregabilidade dos alunos,
-a internacionalização das instituições e
-a qualidade pedagógica dos cursos
Entretanto, a Universidade de Coimbra apela aos antigos alunos para ajudar a recuperar a torre onde "a cabra" continua a dar as horas...

terça-feira, outubro 13, 2009

Banco Mundial procura especialistas de PPP

The PPIAF Advisory Facility managed by World Bank with regional offices in Dakar, Manila, Nairobi and New Delhi is seeking a highly qualified and dynamic Program Manager to be based in Washington, DC for a 3 year renewable term.
Apply by 19-October-2009 to www.worldbank.org/jobs, vacancy no. 091702

The Finance, Economics and Urban Department of the World Bank is seeking two Project Finance Specialists for its Finance and Guarantees unit, which is responsible for developing innovative financial solutions in order to mobilize private sector capital, especially for infrastructure projects. Both positions are 5 year renewable appointments located in Washington, DC.
*The Lead Financial Officer will originate, structure and promote financing for infrastructure investments, including PPP, and sovereign and sub-sovereign debt issuance with World Bank risk mitigation provisions.
* The Senior Infrastructure Finance Specialist will provide financial solutions in support of infrastructure and investment and debt issuance in various sectors and regions.
The candidates will have Master's degree in Finance, Business, Economics or other relevant discipline, and 8-12 years of proven transaction experience.
Apply by 19-October-2009, to http://www.worldbank.org/jobs, vacancy no. 091700 and vacancy no. 091701

ATI sees Chief Executive Officer
The African Trade Insurance Agency, a multilateral development institution created in 2003 by African States with support from the World Bank to provide trade insurance, co-insurance, reinsurance and other financial services is seeking a highly competent and internationally recognized Chief Executive Officer to play a key role in driving profitability and growth and deciding the strategic direction of the Agency.
The position in located in Nairobi, Kenya
Apply by 15-Nov-2009, to www.ati-aca.org/jobs.asp, recruitmentceo@ati-aca.org

Engenheiro de manutenção de estradas, Timor Leste

Road Maintenance Engineer Specialist
Sinclair Knight Merz
Apply Here by 16 October 2009, ida@skm.com.au
Contract Length: Short-term consulting assignment,
6 meses, Dili, Timor

Work Description
Sinclair Knight Merz (SKM) is market leader in providing international development services in a broad range of sectors, including education, health, water/sanitation, environment, governance, infrastructure, transport and agriculture. Adding value through delivering excellent project outcomes is a core value at SKM. Our clients value our competence and our commitment to their vision.
The Asian Development Bank Infrastructure Technical Assistance (ITA) is assisting Timor-Leste's Ministry of Infrastructure (MoI) to prepare, procure and manage consulting services, goods and works required for the annual capital development program. This is a currently running ADB TA Project.
The Specialist
An international Road Maintenance Engineer Specialist will be required to work in the Ministry of Infrastructure (MoI) in Dili, Timor-Leste.
Qualifications:
A qualified road maintenance engineer (RME) specialist is required for a 6 months input in Dilli, with:
Experience in AC pavement design and repair of potholes for roads in countries subjected to prolonged and heavy rainy seasons.
Experience in the assessment/inventory of road conditions and hazards, and in the preparation of detailed work-program.
Have a minimum of 10 years experience in design and maintenance of roads, including that linked to potholes repair in countries having climate condition similar to that of Timor-Leste.
Be thoroughly familiar with capacity building and universal access in the Asian context
Must be fluent in spoken and written English
Fluency in Tetum, Portugese or Bahasa Indonesia would be an advantage

Specific Duties/Tasks:
The major tasks of the Short Term Specialist include but are not limited to the following:
Prepare an initial work-plan for the evaluation and approval of MOI;
Assess and review the data relative to road condition-inventory of potholes;
Assess and review the data on sub-surface test results and recommend other testing program as necessary, in coordination with MOI;
Prepare a detailed design for the repair of potholes;
Prepare quantities, cost estimates, special provisions and any other requirement to form a contract package;
Assess, overview and oversee the testing program and incorporate the findings in the design for repair works;
Coordinate with the MOI consultants undertaking a study of the existing main drainage system in Dili;
Coordinate with other Authorities , where necessary, to resolve man-holes and other hazard to traffic;
Coordinate with other ITA Specialists and MOI for the preparation of bidding documents for the works to be undertaken;
Assist MOI engineers to supervise contractors engaged to undertake works under Phase 1
Conduct on-the-job training program for MOI engineers involved in the design and supervision of works relative to the repair of potholes planUndertake tasks/activities and prepare all periodic and other reports as may be requested by the team leader

If interested in the role, please contact SKM at ida@skm.com.au providing your CV
(in WB or ADB format preferably). Please note that only shortlisted candidates will be contacted.

quinta-feira, outubro 08, 2009

Pacto de Estado en educación en España

"Los padres no quieren que sus hijos sufran el mal logrado "fracaso escolar".

"El ministro Gabilondo habla de un Pacto de Estado por la Educación. "


De facto o que precisamos é um Pacto Ibérico para a Educação.

Foreign medical doctors in Portugal

More than 11% of medical doctors registered in Portugal are foreign born
Setembro 2009

According to the Ordem dos Medicos, the Portuguese medical association, 4400 foreign doctors are registered in Portugal, of which 2631 from the European Union, especially Spain, 698 from Brasil, and 325 from Latin América.

Doctors from outside the European Union, must obtain recognition for their medical qualifications. The registration process must start with recognition of foreign diplomas by a Portuguese university with similar medical curriculum to that of the candidate’s own foreign medical school. Having been granted equivalency, the candidate may then register with the Ordem dos Medicos, the Portuguese medical association.

Some of the foreign doctors such as those from the PALOP Portuguese-speaking countries may register as medical interns and may leave the country upon completion of the specialization studies. Spanish doctors may have also returned to their home country.
Thus the number of practicing foreign medical doctors may be less than the number registered.
Most of the foreign medical doctors work in the SNS, Sistema Nacional de Saude, the official health service, including the emergency services such as the INEM.
Source: DN
See also AMI

terça-feira, setembro 22, 2009

Médico para projecto HIV-SIDA, Moçambique

Apply by: 21 November 2009


Provinicial Coordinator, Elizabeth Glaser Pediatric AIDS Foundation Mozambique

PROVINCIAL PHARMACY ADVISER, Elizabeth Glaser Pediatric AIDS Foundation Mozambique

PROVINCIAL CLINICAL LABORATORY ADVISOR, Elizabeth Glaser Pediatric AIDS Foundation Mozambique

PROVINCIAL ADVISER OF MONITORING AND EVALUATION, Elizabeth Glaser Pediatric AIDS Foundation Mozambique

Clinical Advisor, Elizabeth Glaser Pediatric AIDS Foundation Mozambique

Job Summary
The Foundation's Mozambique office works closely with the USG team and partners and the Ministry of Health in Mozambique, including the provincial and district health teams, to support PMTCT programs in three provinces. With USG/CDC funds to program will expand to include care and ARV treatment in the majority of sites where currently only core PMTCT services are provided. The Foundation's approach is to support the Ministry of Health in increasing access to family focused PMTCT and Care and Treatment programs.
The Clinical Advisor will provide technical assistance and support to the DPS, DDS and health staff at the sites in implementing high quality care and treatment services. He/she will support the strengthening of linkages between PMTCT and care and treatment services. Essential Duties and Responsibilities
Provide technical assistance to health care facilities supported by EGPAF to implement care and ARV treatment services, including staff training and formative supervision, patient flow analysis and referral, support in drug and supply management, support to data collection and monitoring of site performance, linkages for community support.
Technical assistance to the ART team at the site to implement high quality adult and pediatric care and treatment services, including clinical mentoring to strengthen and reinforce clinical skills of practitioners for PMTCT, ART, and diagnosis and treatment of OI.
Coordination of training needs and support the training of ART team and other clinical staff as well as other health staff involved in care and treatment related health services.
Coordinate and supervise required rehabilitation at the sites, including procurement of equipment and supplies;
Develop strong linkages between PMTCT and ART program and ensure functionality of referrals and continuum of care for HIV positive mothers and HIV infected infants into the ART program;
Strengthen linkages between pediatric ward and other points of entry into ART and ensure functionality of referrals and continuum of care;
Collaborate with health staff to develop and strengthen the referral systems and linkages between the different departments and services within the health facilities as well as between health facilities and community based services to ensure follow-up of persons enrolled in care and treatment program;
Develop capacity within the DPS and DDS to perform planning tasks, manage, and supervise the care and treatment program; support establishment and functionality of provincial and district Care and Treatment Taskforce
Support health staff and DDS in data collection and monitoring and evaluation of ART services, to support decision making for management and quality improvement;
Support any operational research (targeted evaluations) to assess efficacy and identify lessons learned and best practices of the care and treatment program;
Management of budget for implementation of ART in the districts;
Prepare and submit monthly activity reports and quarterly EGPAF-required reports to Technical Advisor Care and Treatment and ensure timely feedback to sites and districts.
Develop functional relationships with other partners in the province (NGO/CBO) to ensure coordination of ART training, ART services and related HIV/AIDS preventive and support services.

Required Qualifications
MD Medical Doctor with at least 2 years of experience working in HIV/AIDS programs and international health.
Masters in Public Health or other relevant master degree is an advantage
Essential Skills and Abilities
Extensive clinical experience and excellent knowledge of comprehensive care and treatment of HIV infected adults and children in resource poor settings;
Excellent understanding of current clinical issues and literature on HIV/AIDS treatment
Experience in training, clinical mentoring and supervision;
Skills and knowledge in program management including institutional capacity building and systems development;
Skills and knowledge in use of quality of care assessment and assurance tools;
Excellent analytical, oral and written communication skills. Portuguese language skills a must.
Energetic, independent, self-motivated. Ability to relate and work well cross-culturally.
Good knowledge of Microsoft Office applications (Excel, Word, PowerPoint, Outlook) Knowledge, Skills & Abilities
Understanding of the Mozambique Ministry of Health, including the policy and management structures at national and provincial level.

domingo, setembro 20, 2009

Informático com experiência em banca e microfinança, Manaus, Brasil

IT Program Manager and General Manager for microfinance, Manaus, Brasil
ACCION International

JOB 1
The IT Program Manager, with 10 year's experience, will assist ACCION's microfinance partner in Brazil with deploying and managing technology to support their business strategy. S/he will have management responsibility for all IT related ACCION project in Brazil.
Areas of focus may include:
Core banking and enterprise software selection and implementation;
Planning and deployment of specific banking related technology such as ATMs, POS devices, etc.;
Deploying workflow and business process automation tools;
Business continuity and disaster recovery planning;
Managing data center design, build-out, and expansions;
Network infrastructure design and deployment;
Voice and data communications provisioning;
Monitoring and improvement of IT infrastructure security, reliability, internal controls, and risk management; and
Establishing and measuring return-on-investment for IT projects. The position will be responsible for working in a collaborative fashion with our partner'sIT team to provide on-site IT strategy, implementation and project management support. It will also collaborate closely with ACCIONs functional specialists in lending, risk management, distribution channels, remittances, and other areas.
Responsibilities:
Provide immediate project management for a core-banking system implementation in Columbia, including requirements, gap analysis, customization, rollout planning, vendor management, post-go live issue resolution, and project status reports.
Provide planning and support of IT infrastructures for new Accion MFI startup in Brazil.
Collaborate with functional areas and leading Accion partners to develop innovative ways to drive efficiency, lower transaction costs, reach difficult to serve populations, and improve product offerings.
Work closely with MFI partners� management, users, and the IT Heads to prepare and execute project plan(s).
Performance Measures:
Projects completed on time and on budget with the required functionality.
Early and accurate identification of project risks and issues, along with an appropriate change in course to address each one.
Bank IT departments staffed and trained, including appropriate vendor knowledge transfer.
Establish IT infrastructure metrics, with appropriate monitoring, collation, and benchmarking for partner MFIs.
Rollout of collaborative projects with functional areas that address industry bottlenecks.
Qualifications:
Extensive IT management experience in a commercial banking environment.
Familiarity with enterprise application implementation, integration, and management.
Ability to bridge business strategy and operational drivers with IT capabilities.
Experience in a 7x24 IT operations environment, including data center management, application and network monitoring, and establishing IT performance metrics.
Superior project management and people management skills.
Excellent written and oral communication skills.
Excellent managerial, organizational and analytical expertise.
Operating and P&L experience running a line of business is highly desirable.
Proven ability to interact with and manage across all levels of an organization.
Ability to travel as required to support active projects.
Fluency in Portuguese and English required. Spanish is a plus.
At least ten years of information technology management experience.
At least five years of experience in a banking IT environment.
Formal project management training and experience leading IT projects; PMI certification is desirable.
Previous hands on technical experience in software development, database design and implementation; a degree in Computer Science is a plus.
Exposure to TQM or other process improvement techniques.
Business process and application integration experience highly desirable.
International experience working in developing countries.

JOB 2
Working under a contract with ACCION Amazonia, the incumbent will hold the Chief Executive Officer (CEO) position of a non-deposit taking Microfinance Institution located in Manaus, Brazil. S/he will be responsible for the implementation of a microfinance institution and managing the growth of the organization with support from a team of external consultant, while establishing it as a self-sustainable, profitable organization. S/he needs to be a dynamic self-starter capable of energizing his or her staff providing strong leadership.
Responsibilities:
Be directly responsible for the launch , consolidation and performance of the new institution;
Be the legal Representative of the institution with main responsibility with dealing with regulators and other Government agents and institutions
Report regularly to the Board of Directors of the Brazilian MFI and to the Global Programs Department of ACCION International as required
Provide clear leadership and direction to the organization, by implementing the business and action plans and achieving them based on strategic planning approved by the board;
Ensure that all aspects of the Company's activities obtain profits commensurate with the best interest of shareholders, customers, employees, and the public;
Ensure that the innovation agenda of ACCION International is implemented while pursuing the long-term financial sustainability of the MFI and
Recruit, retain and develop the talent needed to accomplish high performance standards.
Qualifications:
At least five years of experience managing operations and multidisciplinary teams and sales forces in commercial banking in Brazil with extensive background in financial institution management, preferably at senior management level with a proved record of results.
At least five years of direct experience in banking operations preferred in retail banking. Extensive and proven track record in financial institution administration and operations. Experience in micro & small businesses or consumer lending highly recommended. Additional asset: experience in setting-up microfinance institutions.
Strong Skills in financial analysis, risk management and human resources management (at least regional management level).
Advanced degree in area closely related to finance or business administration.
Strategic planning and budgeting exposure.
Excellent negotiation, marketing and presentation skills.
Excellent analytical, communication and interpersonal skills.
Decisiveness and common sense.
Fluency in Portuguese required. Advanced knowledge in Spanish and English highly desirable.
Highly goal and people oriented.
Team worker.
Leadership, coaching and mentoring skills.
Impact and influence.
Integrity.
Willingness to live in Manaus for at least 5 years, with several travels abroad.

See also Grameen Foundation on microcredit

quinta-feira, setembro 17, 2009

Bancos centrais debatem RH em Macau

A qualidade dos recursos humanos e dos gestores bancários são o principal determinante da solidez do sistema financeiro. Directores de recursos humanos dos bancos centrais do Brasil, Guiné-Bissau, Moçambique, Portugal, São Tomé e Príncipe e Timor-Leste, incluindo Portugal reunem-se em Macau para discutir os desafios da gestão de pessoal em período de crise económica.
Para além de temas organizativos, comunicação e motivação, os peritos falam de parcerias estratégicas para a formação bancária e desenvolvimento de capacidades.
Fonte: Lusa

sábado, setembro 12, 2009

Gulbenkian abre candidaturas para projectos de desenvolvimento

A Fundação Gulbenkian abre candidaturas para projectos para as mulheres e a saúde nos PALOP.
http://www.gulbenkian.pt/index.php?section=65&artId=1956

Este concurso destinado a projectos nos Países Africanos de Língua Oficial Portuguesa e Timor-Leste que tenham por objectivo o desenvolvimento educativo e formativo das mulheres e a melhoria das condições de saúde das populações.

VER Boletim de candidatura online , e http://candidaturas.gulbenkian.pt/Pages/ViewPage.aspx?FORM=PGAD01
Ver Regulamento - Concurso de apoio a projectos de cooperação para o desenvolvimento
Informações: cooperacaodesenvolvimento@gulbenkian.pt

Período para candidaturas: até 16-Outubro-2009
Apoio financeiro total, para um período de 2 anos, poderá atingir 70% do custo total do projecto, não ultrapassando os 50 mil Euros.
Entidades elegíveis: ONG sem fins lucrativos, legalmente reconhecidas, com sede em território português, e com uma experiência mínima de 3 anos na área da cooperação internacional.
Projectos elegíveis: devem contribuir para o desígnio de redução da pobreza, através da prossecução de mais de um dos ODM, focando o desenvolvimento educativo e formativo das mulheres e a melhoria das condições de saúde das populações abrangidas. Deste modo, serão considerados os projectos que se desenvolvam numa região devidamente identificada, durante um período máximo de 2 anos, e que preconizem, partindo de um adequado diagnóstico, intervenções articuladas com as Estratégias de Redução da Pobreza dos países parceiros. Dar-se-á prioridade a projectos socioeducativos para mulheres, com propostas inovadoras de criação do seu emprego e que integrem preocupações no domínio da educação para a saúde, em particular na saúde reprodutiva e infantil.

Consultores para Água e Saneamento, São Tomé e Principe

Empresa de Projectos procura consultores para apresentação de uma proposta técnica e financeira no âmbito da "Actualização do Plano Director de Água e Saneamento" do Arquipélago de São Tomé e Príncipe.
As especialidades envolvidas são as seguintes:
Hidrogeologia;
Institucional/ Financeira; avaliação e financiamento do projeco
Hidráulica; Sociologia/Antropologia (análise de evoluções demográficas e aspectos regionais de hábitos das populações e eventualmente a associada à necessidade de implementar campanhas de sensibilização no área de consumo de água e saneamento).

Favor contactar Centrop, centrop@isa.utl.pt com o envio do respectivo curriculum vitae.

sexta-feira, setembro 11, 2009

Cidade Velha como Património Mundial

Cidade Velha, Cabo Verde foi classificada como Património Mundial da Humanidade a 26 de Julho de 2009

A UNESCO decidiu a sua inclusão na lista de Património da Humanidade, respondendo positivamente aos apelos da maioria dos países presentes e ultrapassando resistências do ICOMOS, que pretendia adiar por mais um ano esta deliberação. A favor da candidatura da Cidade Velha estiveram, entre outros, Espanha, Brasil, Kenya, Nigéria, Suécia, Madagáscar, Cuba, Israel, Marrocos, Tunísia, Barbados, Barhein, Egipto, Estados Unidos, Peru, China, Austrália.

A Cidade Velha, a 15 km a oeste da Cidade da Praia, a capital de Cabo Verde, é considerada a primeira cidade construída pelos europeus, neste caso os portugueses, nos trópicos.
A cidade foi construida no século XV para servir de ponto de abastecimento para o comércio marítimo de escravos entre a Europa, África e a América.

Assomada premiada na Gala Mais Portugal Cabo Verde
Fonte: IGESPAR

Gestores de Projecto para Angola

Gender Project Manager, género
Deadline: 30 Sep 2009
Location: Angola
Gender Project Manager Angola, ACCION CONTRA EL HAMBRE as a part of the ACF International Network (ACF-IN), is an international organization that try to save lives by eliminating hunger
Deadline: 30 Sep 2009
Location: Angola
Head of Proyect Health Angola Ref: HoP Health // Angola, Accion Contra el Hambre is an international non-governmental, private, apolitical, non confessional and non-profit organization.

segunda-feira, setembro 07, 2009

Managing PPP for budget sustainability

See article published in the Latin Infrastructure Quarterly, 3rd issue, March 2012 
http://www.liquarterly.com/issue3.htm


Public private partnerhips are an important instrument for financing public investment, but only if implemented with rigor to ensure long-term budget sustainability. The critical issue is getting and maintaining good Value for Money for the taxpayers over the 20-30 year duration of a PPP-concession contract, not just at the time of the tender. But the FIDIC and other public procurement rules focus mostly on the procurement phase, and the contract management post-adjudication may be overlooked.

It is useful to see the work of S. Ping HO on managing incomplete contracts mentioned elsewhere in the PPP Lusofonia blog, http://ppplusofonia.blogspot.com/2009/01/teoria-de-jogos-e-renegociao-de-ppp.html. To summarize, PPP contracts are very long-term, ultra-complex, incomplete by nature and therefore subject to frequent renegotiations, with continuing risk of loss of Value-for-Money for the public partner due to lack of competitive pressure, asymmetries of information and negotiation skills and experience, etc.

So bidders may have an incentive to engage in strategic behaviour, where they bid aggressively, price opaquely and then go into one-on-one direct renegotiations and/or arbitration immediately after adjudication, hoping to recover some of the profitability they gave away in the competitive tender. This could represent “capture of the public partner”, (captura do Concedente), a concept similar to “regulatory capture” which is a well known phenomenon.

The first line of defence against the negative consequences of such “Concedent capture” over the life of the contract is to train and sustain public sector PPP officers and PPP units in the various ministries. This is difficult to do, because the public sector often underestimates the complexity of PPP, there is a scarcity of PPP contract management skills, and PPP units often face resistance from within the public sector as well as from other Stakeholders.

Public sector organizations, such as the IFI, can be instrumental in helping to promote PPP management capacity in the public sector and in propping up Government PPP units, in order to prevent PPP distortions that individual small Governments may be unable to foresee and avoid.

This is why the work of UNECE, WB, EIB, EPEC and EBRD and PPP associations on promoting PPP training and institutional arrangements is so important.

PPP are no panacea for public investment problems. If a country has good investment management skills and insufficient resources, it can gain a lot from doing a few PPP-concession contracts in addition to traditional public works contracting. If a smallish country also has a shortage of contract management skills, the Government is taking on considerable fiscal and budget risks if it undertakes too many PPP-concession contracts without first building the necessary PPP management skills and organisational infrastructure such as PPP units in the Finance and public service ministries.

Good PPP units and well trained PPP officers are probaly more important than PPP legislation in securing and maintaining good Value for Money in long term PPP-concession contracts. As in a commercial bank, it is more critical to have a good credit committee, than a good credit policy guide, though good banks will certainly have both.
Mariana Abrantes de Sousa, former commercial banker and former financial controller
PPP Lusofonia

Prieto on PPP and regulation
See also Cheung, Chan, Kajewski on Enhancing Value for Money

sábado, setembro 05, 2009

Mediarcom promove workshop sobre criação de consensos em PPP

A Mediarcom promove uma sessão prática sobre a criação de concensos sobre os apsectos ambientais de projectos de investimento em regime de PPP- parcerias publico privadas por ocasião do Dia Mundial de Resolução de Conflictos. Evento: Worshop sobre consensos e PPP
Data: sexta-feira, 16-Outubro, 9h00-17h00
Lugar: Reitoria, UNL, Trv Estevão Pinto, Lisboa
Organização: http://www.mediarcom.com.uk/, estoril@mediarcom.com
Agenda:
I. Abordagem de ganhos mútuos na negociação
II. Técnicas de criação de consensos em PPP
III. Exercício interactivo de criação de consensos
IV. Discussão que problemas de sustentabilidade de projectos em PPP
A sessão será liderado por http://www.lawrencesusskind.com/, Ford Professor of Urban and Environmental Planning, MIT e Harvard, considerado um dos mediadores com mais experiência em resolução de diferendos públicos e autor de 16 livros.

O seu livro recente, "Breaking Robert's Rules" (Oxford, 2006) está disponível em português sob o título "Quando a Maioria Não Basta", contacto victorosorio@mail.telepac.pt

quinta-feira, setembro 03, 2009

UNECE reune especialistas para promover um Centro de Excelência em PPP, 14-Set-09, Londres

A 14-Setembro-2009, em Londres a UNECE reune um grupo de especialistas para discutir e preparar a criação de um Centro de Excelência em PPP, para dar apoio sobretudo ao parceiro público no desenvolvimento de capacidades de gestão de PPP e concessões.

Esta iniciativa visa para promover a partilha de conhecimentos e experiências e a capacitação do parceiro público nas parceria público-privadas. A UNECE, a comissão económica das Nacões Unidas para a Europa, já publicou Orientações para a Boa Governação de Parcerias Público-Privadas e reuniu um grupo de especialistas para preparar um Toolkit ou Manual de PPP para a gestão de processos e projectos em regime de PPP.


Purpose of meeting: PPP TRAINING CENTER: BRIDGING THE GAP IN PPP KNOWLEDGE AND SKILLS
Organization: PPP Forum in cooperation with the UNECE Team of Specialists on Public-Private Partnerships
Date: 14-September-2009, 9:30 am – 17.00 pm
Location: 85 Fleet Street, London EC4Y 1AE, Temple Tube station

This meeting follows on various initiatives designed to develop and improve the effectiveness of training on PPPs and to create and maintain PPP materials up to date and used by national PPP officials.

Activities of UNECE Team of Specialists on Public-Private Partnerships:
- Capacity-building programme consisting of consultative meetings with Governments on PPP policy and projects
- Elaboration of a Toolkit on how to do PPPs, to be implemented through national PPP road shows
Activities of World Bank
- Elaborating a Global electronic library of information and best practice on PPPs.

In a UN meeting in February, it was determined that the UNECE would establish a centre to coordinate research, education and training activities in the area of PPPs. It is proposed that the PPP Centre would:
1. Develop and maintain a portfolio of case study materials for the various PPP training initiatives
2. Formalise the involvement of the private sector in PPP capacity building
3. develop a dialogue with governments about their needs in the area of PPPs, and work with the appropriate agencies to ensure that these needs are met
4. Interface with the private sector concessionaires and developers, as well as IFIs to assist governments with the implementation of elements necessary for the development of successful PPP programmes
5. Promote the common shared interests of the PPP sector
6. Establish an academic network of institutions and researchers interested in PPPs, and through this network ensure that PPP materials are kept up to date
7. Act as a coordinator for collaboration between national PPP clubs.

The PPP Centre would be a unique network bringing together the private sector, PPP Units, policy makers and researchers meeting on a regular basis, to facilitate the network and information exchange. It is suggested that the PPP Centre would be hosted by the UN Economic Commission for Europe in Geneva, with an annual budget of around €500,000, financed mainly by membership fees from major organizations interested in PPPs.

Agenda of the meeting of 14-Set-09
1. Discussion on proposal to establish a PPP Centre: objective, demand and outcomes
2. UNECE as a potential host organization for the Center
3. Overview of the UNECE PPP capacity-building programme and mutual added value to set up a Center under the UNECE
4. Prospects for emerging-market PPPs in the current economic climate
5. The enhanced role of MLAs in funding PPPs in a time of economic crisis
6. Discussion on information exchanges and support from PPP clubs and private companies
7. Financial issues of running the PPP Center
For more information, please contact Caroline Jeunet at UNECE (
Caroline.Jeunet@unece.org)

quarta-feira, setembro 02, 2009

Sustentabilidade de contratos de concessão depende de Tribunal Arbitral

Pedidos de reequilibrio financeiro aguardam decisões de Tribunal Arbitral
Inspecção-Geral das Obras Públicas aponta para deficiências na concepção dos projectos e na fiscalização dos contratos de concessão das auto-estradas
por Ana Suspiro , http://www.ionline.pt/, Publicado em 10 de Agosto de 2009

Há pedidos de reequilíbrio financeiro das concessionárias à Estradas de Portugal (EP) no valor de 579 milhões de euros que estão para decisão em Tribunal Arbitral. O número consta do último relatório de actividades da Inspecção-Geral das Obras Públicas, Transportes e Comunicações (IGOPTC -2008), órgão de fiscalização do Ministério das Obras Públicas, que no ano passado analisou a gestão das concessões por parte da EP.

De acordo com o levantamento da Inspecção das Obras Públicas, os pedidos de reequilíbrio financeiro em curso totalizam os 664,4 milhões de euros e foram feitos por cinco concessionárias. Deste montante, transitaram para Tribunal Arbitral reclamações de 578,9 milhões de euros por não ter havido acordo entre as concessionárias e a Estradas de Portugal. Segundo o relatório das parcerias público e privados (PPP) de 2008, divulgado na semana passada, foram pagos às concessionárias rodoviárias 45, 1 milhões de euros a título de reequilíbrios financeiros.

As alterações posteriores aos corredores definidos para as futuras auto-estradas, que resultam das falhas no diálogo entre os diversos poderes do Estado (central, regional e local), têm implicado "inevitavelmente importantes reflexos financeiros negativos", assinala o documento. A Inspecção aponta ainda o dedo aos "prazos excessivos, face aos interesses em equação, nomeadamente de teor financeiro", de aprovação das declarações de impacte ambiental que nestes projectos têm demorado em média 9,2 meses. Estes dados reportam-se aos empreendimentos iniciados em Janeiro de 2007 até à presente data, período em que foram adjudicadas sete concessões rodoviárias. A Inspecção chega mesmo a propor um regime especial de autorizações e licenciamentos para os projectos rodoviários, considerados de interesse nacional (PIN), que evite o risco de atrasos por esta razão.

O relatório da Inspecção-Geral também aponta falhas à actuação da Estradas de Portugal no controlo da gestão das concessões rodoviárias, considerando que a estrutura de acompanhamento e os procedimentos de fiscalização "são insuficientes e apresentam deficiências". Talvez por isso, a EP tenha apenas aplicado duas multas por incumprimento contratual das concessionárias. A empresa alega que alguns processos instaurados não deram origem a sanções porque as concessionárias corrigiram logo as irregularidades em causa. Apesar de constatar que ainda não existe na EP "um verdadeiro sistema de avaliação de desempenho associado à gestão dos contratos de PPP, a empresa demonstrou estar empenhada em colmatar essa lacuna", designadamente através da divulgação de relatórios trimestrais de acompanhamento de cada uma das novas concessões, bem como pela elaboração de um ranking de concessionárias a partir das reclamações dos clientes.

Para já, o diagnóstico feito mostra que a gestão dos contratos de PPP nas fases de concepção e e construção "tem sido deficiente", tal como a monitorização administrativa e financeira dos contratos de PPP.

A IGOPTC alerta ainda para a circunstância de "continuar a verificar-se uma grande dependência da EP de consultores externos", que são contratados por "um recurso sistemático ao ajuste directo" justificado pela "urgência na obtenção dos serviços de assessoria". No que diz respeito às comissões de acompanhamento e de negociação dos pedidos de reequilíbrio, a Inspecção-Geral defende que devem integrar representantes dos Ministérios das Finanças e Obras Públicas e organismos envolvidos - e não apenas por membros nomeados a título individual.
Fontes: http://www.ionline.pt/conteudo/17435-concessionarias-exigem-579-milhoes-euros-ao-estado-tribunal-arbitral-decide
http://www.ig.moptc.pt/tempfiles/20090615131056moptc.pdf

A IGOPTC está de parabéns por esta avaliação da função de Concedente, e pela referência aos numerosos processos de arbitragem em curso, que merecem maior acompanhamento e divulgação. A arbitragem é determinante como mecanismo de resolução de diferendos entre Concedente e concessionário, considerando a redacção habitual dos contratos de concessão.

Veja-se as Bases da Concessão Douro Litoral que constam do Decreto-Lei n.º 392-A/2007, de 27-Dezembro-2007:


“ CAPÍTULO XXVI
Resolução de diferendos
95 — Processo de resolução de diferendos
1 — Os eventuais conflitos que possam surgir entre as partes em matéria de validade, interpretação, aplicação ou integração das regras por que se rege a concessão serão resolvidos por arbitragem.
…
96 — Tribunal arbitral
1 — O tribunal arbitral é composto por três membros, um nomeado por cada parte e o terceiro escolhido de comum acordo pelos árbitros que as partes tiverem designado.
…
3 — Ambos os árbitros designados nos termos do número anterior designam o terceiro árbitro do tribunal, no prazo de 20 dias a contar da designação do segundo árbitro, cabendo esta designação ao presidente do Tribunal Central Administrativo Sul caso a mesma não ocorra dentro do prazo aqui fixado, que também nomeará o árbitro da parte que o não tenha feito.
….
5 — O tribunal arbitral pode ser assistido pelos peritos técnicos e consultores que considere conveniente designar.
6 — O tribunal arbitral julga segundo o direito constituído e das suas decisões não cabe recurso.
7 — As decisões do tribunal arbitral devem ser proferidas no prazo máximo de seis meses a contar da data de constituição do tribunal arbitral, configuram a decisão final de arbitragem relativamente às matérias em causa e incluirão a fixação das custas do processo e a forma da sua repartição pelas partes.
8 — Sempre que esteja em causa matéria relacionada com a reposição do equilíbrio financeiro da concessão, a decisão deve conter, sob pena de nulidade, expressa referência aos efeitos que produz no caso base, contendo instrução detalhada sobre as alterações que as partes, em sua execução, deverão nele introduzir.
9 — A arbitragem decorre em Lisboa, funcionando o tribunal arbitral de acordo com as regras fixadas no contrato de concessão, com as regras estabelecidas pelo próprio tribunal arbitral e ainda, subsidiariamente, pelo disposto na Lei n.º 31/86, de 29 de Agosto, devendo ser observado, quanto aos honorários dos árbitros, o regulamento do Centro de Arbitragem Comercial da Associação Comercial de Lisboa — Câmara de Comércio e Indústria Portuguesa.”

No III Congresso do Centro de Arbitragem da Câmara de Comércio e Indústria Portuguesa (Centro de Arbitragem Comercial) que teve lugar em Lisboa em Julho de 2009, procurou-se a manter e a intensificar as relações com países lusófonos com a susbcrição de um convénio com um entidade no Brasil.

Ver também o programa do DIA MUNDIAL DA RESOLUÇÃO DE CONFLITOS,
15-OUTUBRO-2009 em http://www.mediarcom.com/
Ver também sustentabilidade fiscal de serviços públicos e investimentos em infra-estrutura e

VER também  CAMARB, Câmara de Arbitragem Empresarial, Brasil  

domingo, agosto 30, 2009

Pactos de la Moncloa e Toledo deram contributo chave em tempo de crise

Em tempo de crise e vésperas de eleições, fala-se de um governo de Bloco Central, da necessidade de um pacto de regime para ultrapassar a crise ecónomica. Seria um bom momento de estudar as experiências de outros países com governação mais consensual e menos adversarial e partidarizada.

Os pactos de regime procuram garantir a continuidade das grandes reformas e projectos estruturantes que exigem consensos alargados e estáveis, em contraste com uma governação de pára-arranca que cria instabilidade, incerteza.

Um dos exemplos mas próximos foram os Pactos de la Moncloa e de Toledo em 1977 em Espanha que lançaram a Espanha para três décadas de crescimento.

"Los Pactos de la Moncloa fueron los acuerdos firmados en el Palacio de la Moncloa durante la transición española el 25 de octubre de 1977 entre el Gobierno de España de la legislatura constituyente, presidido por Adolfo Suárez, los principales partidos políticos con representación parlamentaria en el Congreso de los Diputados y las asociaciones empresariales y el sindicato Comisiones Obreras, con el objetivo de procurar la estabilización del proceso de transición al sistema democrático, así como adoptar una política económica que contuviera la galopante inflación que alcanzaba el 47%."

VER também:
Rede de Estudos do Mercado Espanhol: Pactos de la Moncloa e Toledo lançaram milagre económico espanhol
Consenso entre as Partes Interessadas como factor crítico de sucesso no investimento público, 1 2

sábado, agosto 29, 2009

Danida financia project Saúde em Moçambique

Diversas Consultoras internacionais procuram especialistas em financiamento e gestão da saúde para candidaturas a projecto financiado pela DANIDA em Moçambique

Mozambique Senior-level consultant, 3 years
Technical Specialist Health (Saúde)Management, Finance and Incentives
Danida Health sector Project, Long-term consulting assignment, 3 years
Organization(s): NIRAS, Mozambique
Apply By: 26 September 2009

NIRAS is submitting a tender for the Danida funded project Monitoring and implementation Group for the National Human Resource Development Plan (PNDRHS) - 2008 - 2015 in the Ministry of Health in Mozambique.
The objective of the technical assistance is to assist the Mozambican authorities with the coordination of the implementation of the PNDRHS (National Health Human Resource Development Plan 2008-2015 - PNDRHS).
The DANIDA financed contract will be a three year contract with expected commencement 1. January 2009. For this project we need input from Portuguese speaking, long term experts in the field of health and human resources. Below the specific qualifications required is described.

Technical Specialist for Management, Finance and Incentives for Danida Health sector Project in Mozambique
General qualifications- University degree (Masters or Doctorate) in HR Management, Health finance, Health Economics or related field- Extensive professional experience in human resource management and / or financing of human resources
- Experience from donor supported heath sector project/programme implementation- Experience in drawing up work plans and technical, administrative and financial reportsSpecific qualifications
- Thorough experience from working at senior-level in the area of management and/or financing of human resources in the health sector
- Proven experience in curriculum development, training needs assessment, training and evaluation in financial management and / or management of human resources
- Experience with development, implementation and evaluation of incentive strategies and packages
- Demonstrated capacity for inter-institutional collaboration at a senior level- Good communication skills
- Good understanding of gender mainstreaming in human resources management, including in the development of incentive strategies Experience in the region and language- Extensive experience working in the health sector in Mozambique or other African countries- Fluency in English
- Fluency in written and spoken Portuguese is a requirementWorkplaceNational Directorate of Human Resources of the Ministry of Health of MozambiqueQualified candidates are encouraged to submit their CV to Anna Cecilie Tang Varnild-Jørgensen at avj@niras.dk. Only candidates with sufficient qualifications will be contacted

_____________________________


SPECIALIST FOR MONITORING, EVALUATION AND RESEARCH FOR MONITORING AND IMPLEMENTATION GROUP FOR THE NATIONAL HUMAN RESOURCE DEVELOPMENT PLAN (PNDRHS) – 2008-2015 IN THE MINISTRY OF HEALTH IN MOZAMBIQUE
Organization(s): SIM, Società Italiana di monitoraggio SpA
Apply By: 25 September 2009

1. BACKGROUND
In order to respond to Mozambique challenges and constraints, the Ministry of Health (MISAU), with the support of external co-operation partners, has developed a plan which is wide-ranging and ambitious-yet realistic-for human resource development in the health sector (National Health Human Resource Development Plan 2008-2015 - PNDRHS). The plan includes the national priorities identified in the National Health Policy and in the current Strategic Plan for the Health Sector, and will provide continuity to the previous human resource development plans of 1992-2002, 2001-2010 and 2006-2010.
The plan has the following objectives:
Contribute to achievement of the Millennium Development Goals;
Improve the training capacity of the Ministry of Health;
Reduce the deficit as regards human resources in the health area
Reduce the inequalities between provinces as regards human resources in the health area;
Correct the intra-provincial distortions and those between districts;
Improve the quantitative and qualitative performance of the human resources in the health area;
Achieve retention of the work force within the National Health System;
Improve the definition of the regulatory duties of the human resources in the health area within the health services system.
The achievement of the plan's eight objectives will be facilitated through general and cross-cutting strategies which include:
Build the capacity of individual managers, regulators, service managers, and providers, i.e., support procurement and improvement in terms of expertise, competencies, and attitudes;
Strengthen organizational capacities, e.g., the operation of information systems; monitoring, supervision, and evaluation processes; the availability of management; decision support; and resource mobilization tools;
Develop professional and financial subsidies and incentives packages to stimulate the performance of all cadres and to mobilize individual and institutional willingness to support the achievement of the proposed objectives and targets; and
Create an adequate institutional environment through changes in the legal and regulating framework to facilitate attainment of the proposed targets.
The PNDRHS identifies four strategic lines of approach, identified and characterised within four packages:
Organize NHS services and normative framework;
Improve management capacity at all levels of the NHS;
Improve HHR distribution, motivation, and retention; and
Increase capacity of the initial production, post-graduate training, and in-service training networks.
PNDRHS Monitoring and Implementation Group (MI-PNDRHS)
To coordinate the implementation of the PNDRHS, a PNDRHS Monitoring and Implementation (MI-NPHHRD) group will be set up. The group, which will consist of a team of four multi-disciplinary senior technical staff, will work under the direct supervision of the National Director of Human Resources.

The following are some of the main tasks of the MI-PNDRHS:
Design and execute a Communication Plan for the different PNDRHS audiences. This plan shall use various resources, such as newspaper, radio, television, brochures, and posters, as well as new Web-based technologies.
Collaborate with the soon to be established Health Human Resources Observatory. The goal of the Health Human Resources Observatory is to promote and incentivize evidence-based Health Human Resources strategies and interventions and develop capacity to evaluate and monitor the Health Human Resources situation.
Promote and validate planning exercises in several provincial settings, maintaining a macro view of the Mozambican reality.
Establish agreements and partnerships with public services to ensure access to necessary and adequate resources for the implementation of PNDRHS activities.
Create a technical assistance plan for the PNDRHS, allocating parts of the management of this plan to different stakeholders involved in its implementation.
Create a Mozambican human resources for health Research Plan and follow up the implementation of the plan.
Develop and implement monitoring and evaluation mechanisms for the PNDRHS.
Formalize an incentive package to be allocated to the national and provincial decision-makers for achievement of the activities anticipated in the plan.
Danida will fund the following specialists, which will be part of the MI-PNDRHS:
a coordinator, who will support the MISAU National director of Human Resources in the implementation of the PNDRHS, and co-ordinate the activities of the MI-PNDRHS group,
a management, finance and incentives specialist, and
a monitoring, evaluation and research specialist

A further specialist, responsible for management and coordination of MI-PNDRHS activities in the area of work place health and safety, with particular emphasis on HIV/AIDS prevention and mitigation among MISAU employees and their families will be recruited by MISAU and financed by GTZ.

The financed contract will be a three year contract with expected commencement 1. January 2009.
OBJECTIVE OF TECHNICAL ASSISTANCE
The objective of the technical assistance is to assist the Mozambican authorities with the coordination of the implementation of the PNDRHS.
4. TERMS OF REFERENCE FOR THE TECHNICAL SPECIALIST FOR MONITORING, EVALUATION AND RESEARCH
Title of the Technical Specialist
MI-PNDRHS Technical Specialist for Monitoring, Evaluation and Research
Main Objective of the Position
Conduct and co-ordinate the activities of the MI-PNDRHS in the areas of monitoring, evaluation and research in human resources for health.
Duties and Activities
a) Ensure that decision-making regarding human resources for health are undertaken based on evidence and the availability of data, information and knowledge regarding RHS at national level;
b) Support the development of capabilities within the local institutions to evaluate and monitor the health human resources situation in the country;
c) Establish a system of monitoring of progress and of the quality of PNDRHS interventions, including regular report writing and presentation to senior managers;
d) Annually systematise the information concerning human resources for health, in accordance with a standardised format;
e) Coordinate the development and implementation of a Plan for Research on human resources for health in Mozambique;
f) Co-ordinate publication of the results of the research studies on human resources for health, undertaken in the context of implementation of the PNDRHS, as well as their dissemination inside and outside the country, in magazines and journals and at human resources for health events;
g) Establish a platform-a community of knowledge-of producers and users of information on human resources for health and for advocacy for the development of human resources for health;
h) Organise periodic events-both for the public and for partners-for dissemination of evidence and information on human resources for health and on advances in implementation of the PNDRHS;
i) Be part of the founding committee for the Human Resources for Health Observatory
j) Propose and organise the resources for external consultancy services in the area of research and monitoring and evaluation, when needed;
k) Regularly present progress reports on the activities of the PNDRHS within the area of research and monitoring and evaluation.

Qualifications of the Technical Specialist
General qualifications
- University degree (Masters or Doctorate) in Public Health, Political Science or related field
- Specialized in research and/ or monitoring and evaluation
- Extensive relevant professional experience in monitoring and evaluation and/or research.
- Experience from donor supported heath sector project/programme implementation
- Experience in drawing up work plans and technical and administrative reports
Specific qualifications
- Thorough experience from work in the area of monitoring and evaluation and/or research related to human resources in the health sector
- Experience with the development and implementation of capacity building strategies related to monitoring and evaluation in the health sector
- Experience with dissemination of and ensuring usage of research results for policy decision making
- Knowledge of software packages like SPSS, EpiInfo etc.
- Demonstrated skills in formulating, implementing, supervising and evaluating research activities regarding human resources in the health sector
- Good communication skills
- Good understanding of gender issues related to monitoring and evaluation and / or research for health human resources

Experience in the region and language
- Extensive experience working in the area of health in Mozambique or other African countries
- Fluency in English
- Fluency in written and spoken Portuguese is a requirement
Workplace
National Directorate of Human Resources of the Ministry of Health of Mozambique
Level and Lines of Authority
The MI-PNDRHS Technical Specialist for Monitoring, Evaluation and Research will report to the MI-PNDRHS Co-ordinator.
Duration of the Position
Three years. The Technical Specialist's performance will be evaluated annually following the agreed quality assurance procedures. Continuation of the contract will depend on satisfactory performance.
______________________

CO-ORDINATOR FOR CONSULTANCY SERVICES FOR MONITORING AND IMPLEMENTATION GROUP FOR THE NATIONAL HUMAN RESOURCE DEVELOPMENT PLAN (PNDRHS) – 2008-2015 IN THE MINISTRY OF HEALTH IN MOZAMBIQUE
Organization(s): SIM GICO Long-term consulting assignment
Apply By: 27 September 2009

Description
A recent analysis of the situation regarding health in Mozambique noted that quantitative and qualitative shortfalls, and the regional asymmetries in terms of health workers, represent the principal barrier to sustainability and expansion of the improvement in health indicators which the country has achieved in recent years.In order to respond to these challenges and constraints, the Ministry of Health (MISAU), with the support of external co-operation partners, has developed a plan which is wide-ranging and ambitious-yet realistic-for human resource development in the health sector (National Health Human Resource Development Plan 2008-2015 - PNDRHS).
The plan includes the national priorities identified in the National Health Policy and in the current Strategic Plan for the Health Sector, and will provide continuity to the previous human resource development plans of 1992-2002, 2001-2010 and 2006-2010.The plan has the following objectives:
• Contribute to achievement of the Millennium Development Goals;
• Improve the training capacity of the Ministry of Health;• Reduce the deficit as regards human resources in the health area
• Reduce the inequalities between provinces as regards human resources in the health area;• Correct the intra-provincial distortions and those between districts;
• Improve the quantitative and qualitative performance of the human resources in the health area;
• Achieve retention of the work force within the National Health System;
• Improve the definition of the regulatory duties of the human resources in the health area within the health services system.The achievement of the plan's eight objectives will be facilitated through general and cross-cutting strategies which include:
• Build the capacity of individual managers, regulators, service managers, and providers, i.e., support procurement and improvement in terms of expertise, competencies, and attitudes;
• Strengthen organizational capacities, e.g., the operation of information systems; monitoring, supervision, and evaluation processes; the availability of management; decision support; and resource mobilization tools;
• Develop professional and financial subsidies and incentives packages to stimulate the performance of all cadres and to mobilize individual and institutional willingness to support the achievement of the proposed objectives and targets; and
• Create an adequate institutional environment through changes in the legal and regulating framework to facilitate attainment of the proposed targets.
The PNDRHS identifies four strategic lines of approach, identified and characterised within four packages:• Organize NHS services and normative framework;
• Improve management capacity at all levels of the NHS;
• Improve HHR distribution, motivation, and retention; and
• Increase capacity of the initial production, post-graduate training, and in-service training networks.PNDRHS Monitoring and Implementation Group (MI-PNDRHS)To coordinate the implementation of the PNDRHS, a PNDRHS Monitoring and Implementation (MI-NPHHRD) group will be set up.
The group, which will consist of a team of four multi-disciplinary senior technical staff, will work under the direct supervision of the National Director of Human Resources.
The following are some of the main tasks of the MI-PNDRHS:
• Design and execute a Communication Plan for the different PNDRHS audiences. This plan shall use various resources, such as newspaper, radio, television, brochures, and posters, as well as new Web-based technologies.
• Collaborate with the soon to be established Health Human Resources Observatory. The goal of the Health Human Resources Observatory is to promote and incentivize evidence-based Health Human Resources strategies and interventions and develop capacity to evaluate and monitor the Health Human Resources situation.
• Promote and validate planning exercises in several provincial settings, maintaining a macro view of the Mozambican reality.
• Establish agreements and partnerships with public services to ensure access to necessary and adequate resources for the implementation of PNDRHS activities.
• Create a technical assistance plan for the PNDRHS, allocating parts of the management of this plan to different stakeholders involved in its implementation.
• Create a Mozambican human resources for health Research Plan and follow up the implementation of the plan.
• Develop and implement monitoring and evaluation mechanisms for the PNDRHS.
• Formalize an incentive package to be allocated to the national and provincial decision-makers for achievement of the activities anticipated in the plan.
Danida will fund the following specialists, which will be part of the MI-PNDRHS:
• a coordinator, who will support the MISAU National director of Human Resources in the implementation of the PNDRHS, and co-ordinate the activities of the MI-PNDRHS group,
• a management, finance and incentives specialist, and
• a monitoring, evaluation and research specialist
*A further specialist, responsible for management and coordination of MI-PNDRHS activities in the area of work place health and safety, with particular emphasis on HIV/AIDS prevention and mitigation among MISAU employees and their families will be recruited by MISAU and financed by GTZ.
The DANIDA financed contract will be a three year contract with expected commencement 1. January 2009.

OBJECTIVE OF TECHNICAL ASSISTANCE
The objective of the technical assistance is to assist the Mozambican authorities with the coordination of the implementation of the PNDRHS.
EXPERT PROFILE:
Main Objective of the Position
Support the MISAU National Director of Human Resources in the implementation of the PNDRHS and co-ordinate the activities of the MI-PNDRHS team of specialists. Specific emphasis is put on leadership and management (planning and coordination).Duties and ActivitiesThe MI-PNDRHS Co-ordinator will support the MISAU's National Director of Human Resources and will work under his/her leadership on the following activities:
a) Co-ordinate the activities of the monitoring and implementation group and, together with the appropriate departments and bodies, arrange for the resources and instruments needed for the performance of its duties;
b) Ensure the constant updating and adaptation of the PNDRHS and its component parts, in line with new information as may come to light, with the results of implementation of the Plan, and with the resources mobilised;
c) Co-ordinate the drawing up of a Technical Assistance Plan for PNDRHS training; the management of particular parts of this Plan may be delegated to various parties involved in its execution;
d) Provide guidance to the MI-PNDRHS Technical Specialists, review their specific work plans and provide them with the support needed for fulfilment of their duties;
e) Identify partners for various activities within the various strategic perspectives of the PNDRHS and contract out the execution of these activities to them, in partnership with the public services, as well as arranging access to the necessary resources;
f) Co-ordinate with other bodies within MISAU, and with other sectors, partners and donors, concerning aspects of implementation and support for the activities of the PNDRHS;
g) Co-ordinate with the other bodies within MISAU, and with other sectors, the actions which are relevant for successful implementation of the PNDRHS;
h) Dynamise, stimulate and validate planning exercises conducive to adaptation of the PNDRHS at provincial, district and municipal levels, in such a way as to draw up Provincial RHS Plans;
i) Advise the decision-making bodies of the central, provincial, municipal and district administration on matters related to RHS, specifically in the decisions for planning, acquisition and installation of services, resources and technology suited to the objectives to be pursued;
j) Propose and organise the resources for external consultancy services, when such are needed;
k) Propose the secondment or transfer of staff from the Ministry of Health, and from other Ministries, universities, public institutions and municipalities, as may be needed in order to assist in implementation of the PNDRHS;
l) Co-ordinate the ongoing monitoring and evaluation of the process of PNDRHS implementation, and ensure that the targets and objectives proposed are reached;
m) Present regular progress reports on PNDRHS implementation;
n) Within the time limit of one month following publication of the Ministerial Order, submit a proposal to the National Director of Human Resources outlining criteria to be observed in provincial health departments before the roll out of capacity strengthening for human resources management, foreseen to take place in all provinces.
The proposal should include the names of individuals to take on relevant duties in the provinces where such criteria are met, their terms of reference (for both the teams and the individuals), the time limits for execution of the activities foreseen, and the financial resources and budgets for operation of these teams;

Qualifications of the Co-ordinator
General qualifications
 University degree (Masters or Doctorate) in HR Planning and Management, Public Health or related field Extensive relevant professional experience
 Experience from donor supported heath sector project/programme implementation
 Experience in drawing up work plans and technical, administrative and financial reports
Specific qualifications
 Experience in leading and managing change processes;
 Strong management experience particularly human resource management in the health sector, and in particular within Health Ministries
 Thorough experience of working at senior level in the area of planning and supervision of planning processes in the health sector
 Demonstrated capacity for inter-institutional collaboration at a senior level
 Experience in developing and implementing capacity building strategies  Experience in evidence based sector policy formulation and policy decision processes in developing countries
 Good communication skills
 Good understanding of gender and gender mainstreaming strategies
Experience in the region and language
 Extensive experience working in the health sector in Mozambique or other African countries Fluency in English
 Fluency in written and spoken Portuguese is a requirement
Workplace National Directorate of Human Resources of the Ministry of Health of Mozambique
Level and Lines of Authority
The MI-PNDRHS Co-ordinator will have responsibilities equivalent to those of a Deputy National Director, and will report to the National Director of the National Directorate of Human Resources of the Ministry of Health.
Duration of the Position: 3 years.
The Coordinator's performance will be evaluated annually following the agreed quality assurance procedures. Continuation of the contract will depend on satisfactory performance.

Ver programa DANIDA para saúde e HIV em Moçambique em
http://www.danidadevforum.um.dk/NR/rdonlyres/6BB69E9F-BA08-40DB-B6D8-0EAF30B0A06B/0/MozambiqueSPSHealth.pdf

Governo electrónico em Moçambique

Q6220 - Project Coordinator, Deadline: Mar 3, 2009 (past)
Country: Mozambique, Maputo
Notice/Contract Number: 1-2009/MEGCIP
Funding Agency: World Bank
Buyer:
Mozambique eGovernment and Communication Infrastructure Project (MEGCIP)Ministry of Communications
Eligibility of Bidders:
a) Have a Bachelors or Honours Degree in computer sciences or engineering and advanced university degree (Masters or PhD) in project management, business administration and/or Information and Communication Technologies
b) Have at least five year experience of successfully managing complex information and communication technology projects
c) Have a solid and demonstrated understanding of communication infrastructure and services projects as well as of eGovernment architectures and applications
d) Have strong leadership capacities and a demonstrated record of successful leadership of multi-disciplinary teams
e) Have a demonstrated focus on impact and results
f) Speak Portuguese fluently and have an excellent conduct of English language
Contact: Domingos Colaço, Ministry of Science and Technology
Avenida Patrice Lumumba n. 770 Maputo Mozambique
Telephone: (+258) 21 352800

Conservação da Natureza em Espanha

Spain Mid-level
Species Program Coordinator
The International Union for Conservation of Nature (IUCN)
Apply By: 04 September 2009

Organization(s): The International Union for Conservation of Nature (IUCN)

Job Summary
The International Union for Conservation of Nature (IUCN) was founded in 1948 and brings together over 1,290 members(States, government agencies, NGOs and affiliates) and some 10,000 scientists a...…

sexta-feira, agosto 28, 2009

Ministros da CPLP promovem cooperação na Lusofonia

Portugal, que este ano preside à CPLP, Comunidade de Países de Língua Portuguesa, recebe várias reuniões dos Ministros da CPLP:

Sábado, 29-Agosto-2009, Hotel Ritz, Lisboa
Ministros da Ciência e Ensino Superior,
(Science and Higher Education) http://http://www.mctes.pt//
Agenda:
*Preparação de um Centro UNESCO distribuido de formação avançada em ciências e integração em redes e programas internacionais de investigação, facilitando assim o desenvolvimento científico dos países de origem e combatendo a fuga de capacidades científicas.
*Cooperação no domínio da avaliação independente de instituições e cursos de ensino superior no espaço lusófono.
*Balanço da cooperação nos domínios científico, tecnológico e do ensino superior no espaço da CPLP.
*Novas áreas de cooperação incluindo novos domínios e programas de trabalho conjunto.

Terça-feira, 8-Setembro-2009, Sala Almada Negreiros, Centro Cultural de Belém, Lisboa
Mesa Redonda sobre Cooperação para a Saúde no Espaço da CPLP (health)
Agenda:
*Mobilizar apoios para a concretização do PECS/CPLP, Plano Estratégico de Cooperação em Saúde (PECS) da Comunidade de Países de Língua Portuguesa (CPLP)
Ver Alto Comissariado da Saúde, PECS e Declaração do Estoril